---
name: hashgraph-online-visual-design-orchestrator
description: "Use after requirements are approved to run the one-pass Pencil or Figma workflow that creates visual boards, exports images, records approval, and hands off to implementation gates."
license: "Apache-2.0"
metadata:
  decimalai-skill-id: "6159d5d1-ec29-4191-9a5e-2eefb81c83ab"
  decimalai-version-id: "fef2b24a-c069-4533-877f-4959bed90108"
  decimalai-version: "1"
  decimalai-body-sha256: "062465a215485e2b049d6205b7d9aaac54efaf51fef97098b6b3a7a160a59216"
  decimalai-name: "hashgraph-online/visual-design-orchestrator"
  decimalai-format: "1"
  decimalai-invocation: "model"
  decimalai-category: "design-media"
  decimalai-source: "https://app.decimal.ai/s/hashgraph-online-visual-design-orchestrator@1/SKILL.md"
---
# Visual Design Orchestrator

This skill coordinates the design-tool execution path. It does not replace user approval or visual evidence review; it makes the steps explicit and repeatable.

## Input Artifacts

- `00-stage.json`
- `10-visual-confirmation-plan.md`
- Product, IA, interaction, state, visual, HeroUI, and acceptance contracts
- HeroUI component mapping
- Optional TailwindUI reference index

## Output Artifact

- `docs/full-stack-development/requirements/<feature-slug>/04-visual/visual-evidence.md`

## Required MCP Tool

- `plan_visual_design_orchestration`
- `generate_design_board_inventory`
- `review_visual_design_orchestration`
- `review_visual_evidence`
- `review_stage_gate`

## Hard Stops

- Do not start Pencil/Figma until the requirement workspace passes `review_requirement_workspace_stage` for visual design.
- Do not skip Pencil `get_editor_state(include_schema: true)`.
- Do not skip required Figma skills before Figma write operations.
- Do not proceed with only chat approval; write the approval record into `visual-evidence.md`.
- Do not proceed to implementation until `review_visual_design_orchestration`, `review_visual_evidence`, and `review_stage_gate` all pass.

## Pressure Test Responsibility

- Missing design board inventory must block.
- Missing desktop, mobile, component-detail, or state-matrix export must block.
- Missing user approval record must block.
- Stale visual evidence after requirement change must block.

## Next Gate

- `implementation-planner` may run only after visual orchestration and visual evidence both pass.
