Install any skill in seconds. Free to start, no credit card required.
Get Started Free →Use when planning a CoRL submission cycle end to end — the late-May abstract and paper deadlines, the summer review window, first-round rejection risk, the August one-page rebuttal and discussion period, autumn decisions, the October PMLR camera-ready, and the November conference — including what to do between milestones.
.claude/skills/brycewang-stanford-corl-workflow/SKILL.md| Test case | Without → With | Effect | Δ tokens | Δ turns |
|---|---|---|---|---|
| case-01 | ✗→✓ | ▲ Improved | 41% | 0% |
| case-06 | ✗→✓ | ▲ Improved | 38% | 0% |
| case-08 | ✗→✓ | ▲ Improved | 115% | 0% |
| case-09 | ✗→✓ | ▲ Improved | 61% | 0% |
| case-10 | ✗→✓ | ▲ Improved | 105% | 0% |
CoRL runs one cycle per year on a spring-submit / autumn-decide / November-meet rhythm. This skill turns the 2026 calendar (verified 2026-07-08 via corl.org, OpenReview, and the conference's public timeline) into a working plan, including what a team should be doing right now in each phase.
| Milestone | CoRL 2026 date | Status on 2026-07-08 | |---|---|---| | Abstract registration | May 26, 2026 | passed | | Paper + supplementary deadline | May 29, 2026 | passed | | Review period (reviewers, ACs, SACs) | June – early August 2026 | in progress | | Reviews released / first-round rejections | early August 2026 exact date 待核实] | upcoming | | One-page PDF rebuttal due | August 11, 2026, 11:59 PM AoE | upcoming | | Reviewer–AC discussion window | August 12–19, 2026 | upcoming | | Decision notification | September 2026 exact date 待核实] | upcoming | | Camera-ready to PMLR pipeline | October 12, 2026, 23:59 AoE | upcoming | | Conference (JW Marriott, Austin, TX) | November 9–12, 2026 (workshops Nov 9) | upcoming |
Every date above is a single cycle's snapshot. The 2027 cycle will publish its own timeline at the corl.org year-site; nothing here transfers automatically.
experiments you may need for the rebuttal instead.
more seeds, more evaluation episodes, a missing robot-learning baseline, and a real-robot check for a sim-heavy paper. Run these before reviews land; the window between reviews and the August 11 rebuttal deadline is days, not weeks.
identity; review is double-anonymous until decisions.
corl-topic-selection), so a first-roundrejection in early August converts to a resubmission plan the same week.
with no score of weak-accept-or-above from any reviewer or the AC is a candidate for rejection without rebuttal. If you are past that gate, the rebuttal is live — switch to corl-author-response immediately.
prepared experiment, (c) requires concession. One page forces this triage anyway.
reviewer–AC discussion (Aug 12–19) can surface follow-ups, and reviewers are asked to update scores when a rebuttal warrants it.
no author-visible activity in that stage, so use September for the camera-ready or resubmission branch prep.
absorb review feedback), \usepackage[final]{corl_2026}, appendix merged into the same PDF, due October 12, 23:59 AoE — see corl-camera-ready.
camera-ready knowing the exchange will be readable next to it.
(corl-artifact-evaluation) in parallel, not sequentially.
yaml# corl-cycle-plan.yaml — assign an owner and a date to every row paper_id: "" phase_now: post-submission # update as the cycle advances rebuttal_prep: extra_seeds_run: {owner: , status: } # started before reviews arrive missing_baseline: {owner: , status: } real_robot_spotcheck: {owner: , status: } one_page_template_ready: {owner: , status: } # LaTeX skeleton compiled dates_to_watch: reviews_released: "early Aug 2026 (待核实 — watch OpenReview + corl.org)" rebuttal_due: "2026-08-11 23:59 AoE" discussion: "2026-08-12..19" decision: "Sep 2026 (待核实)" camera_ready: "2026-10-12 23:59 AoE" fallback: venue: "" # decided BEFORE decisions arrive required_rework: ""
Working backward from a late-May deadline (the 2026 pattern; 2027 dates 待核实):
time and teleop data are the long poles in robot-learning projects.
sim-to-real evidence, the real-robot rig must exist by now, not in April.
splits — corl-experiments); start the paper with the Limitations section drafted early, since it is mandatory and counts inside the 8 pages.
(corl-supplementary); anonymization sweep of paper, video, and any site.
(2026 spacing: May 26 vs May 29); final OpenReview form checks per corl-submission.
reviews arrive routinely miss it. Prepare in the quiet period.
discussion (corl-topic-selection) before investing deadline-week effort.
real-robot table in the final month.
Reconfirm every date at https://www.corl.org/ (2026 cycle) or the 2027 year-site before acting; this file records the 2026-07-08 state of knowledge.
| Case | Status | Duration (ms) | Turns | Tokens | Tool calls | ||||||||
|---|---|---|---|---|---|---|---|---|---|---|---|---|---|
| Without | With | Δ | Without | With | Δ | Without | With | Δ | Without | With | Δ | ||
case-01 | fail→pass | 21,299 | 18,768 | -12% | 1 | 1 | 0% | 2,797 | 3,932 | +41% | 0 | 0 | — |
case-02 | fail→fail | 58,331 | 25,144 | -57% | 1 | 1 | 0% | 1,220 | 5,463 | +348% | 0 | 0 | — |
case-03 | fail→fail | 27,661 | 20,085 | -27% | 1 | 1 | 0% | 3,815 | 4,248 | +11% | 0 | 0 | — |
case-04 | pass→pass | 9,215 | 5,331 | -42% | 1 | 1 | 0% | 1,494 | 2,570 | +72% | 0 | 0 | — |
case-05 | pass→pass | 18,746 | 16,373 | -13% | 1 | 1 | 0% | 2,058 | 3,314 | +61% | 0 | 0 | — |
case-06 | fail→pass | 15,672 | 14,515 | -7% | 1 | 1 | 0% | 2,287 | 3,160 | +38% | 0 | 0 | — |
case-07 | pass→pass | 20,574 | 10,841 | -47% | 1 | 1 | 0% | 2,382 | 2,666 | +12% | 0 | 0 | — |
case-08 | fail→pass | 13,181 | 9,378 | -29% | 1 | 1 | 0% | 1,164 | 2,499 | +115% | 0 | 0 | — |
case-09 | fail→pass | 18,895 | 15,024 | -20% | 1 | 1 | 0% | 1,823 | 2,936 | +61% | 0 | 0 | — |
case-10 | fail→pass | 13,384 | 11,148 | -17% | 1 | 1 | 0% | 1,266 | 2,590 | +105% | 0 | 0 | — |
case-11 | fail→pass | 13,126 | 4,378 | -67% | 1 | 1 | 0% | 1,293 | 2,480 | +92% | 0 | 0 | — |
case-12 | fail→pass | 18,886 | 12,752 | -32% | 1 | 1 | 0% | 2,097 | 2,622 | +25% | 0 | 0 | — |
case-13 | fail→pass | 17,905 | 11,628 | -35% | 1 | 1 | 0% | 2,021 | 2,709 | +34% | 0 | 0 | — |
case-14 | fail→pass | 22,594 | 9,952 | -56% | 1 | 1 | 0% | 2,233 | 2,496 | +12% | 0 | 0 | — |
case-15 | fail→pass | 38,822 | 21,929 | -44% | 1 | 1 | 0% | 2,704 | 3,797 | +40% | 0 | 0 | — |
case-16 | pass→pass | 17,011 | 10,555 | -38% | 1 | 1 | 0% | 2,606 | 2,599 | -0% | 0 | 0 | — |
case-17 | pass→pass | 16,755 | 9,639 | -42% | 1 | 1 | 0% | 1,547 | 2,911 | +88% | 0 | 0 | — |
case-18 | pass→pass | 9,147 | 9,189 | +0% | 1 | 1 | 0% | 1,216 | 2,388 | +96% | 0 | 0 | — |
case-19 | fail→fail | 20,209 | 23,910 | +18% | 1 | 1 | 0% | 3,725 | 4,475 | +20% | 0 | 0 | — |
case-20 | pass→pass | 20,589 | 22,207 | +8% | 1 | 1 | 0% | 2,420 | 4,127 | +71% | 0 | 0 | — |
case-21 | pass→pass | 20,175 | 18,229 | -10% | 1 | 1 | 0% | 2,203 | 3,668 | +67% | 0 | 0 | — |
case-22 | pass→pass | 16,479 | 18,066 | +10% | 1 | 1 | 0% | 2,072 | 3,590 | +73% | 0 | 0 | — |
DecimalAI ran this skill against gemini-3.6-flash twice over the same eval suite — once with the skill loaded and once without — and compared the two runs case by case. 22 cases were attempted, and 21 counted toward the lift figure. The other 1 produced results that are not comparable between the two arms, so they are excluded from the headline rather than averaged into it. The headline lift of +45 percentage points is the difference between those two pass rates over the 21 comparable cases.
Without the skill loaded, the model failed this case. With it loaded, the same prompt on the same model passed. This is one improved case from the latest verified run; every case, including any that regressed, is in the table above.
Other measured skills in the registry, with their headline benchmark lift.