Get Started Free →Plan organizational capacity for construction projects. Forecast resource needs, identify capacity gaps, and support strategic planning for project pursuit and staffing.
.claude/skills/datadrivenconstruction-capacity-planning/SKILL.md| Test case | Without → With | Effect | Δ tokens | Δ turns |
|---|---|---|---|---|
| case-01 | ✗→✓ | ▲ Improved | 167% | 0% |
| case-02 | ✗→✓ | ▲ Improved | 71% | 0% |
| case-03 | ✗→✓ | ▲ Improved | 127% | 0% |
| case-07 | ✗→✓ | ▲ Improved | 229% | 0% |
| case-08 | ✗→✓ | ▲ Improved | 113% | 0% |
Strategic capacity planning for construction organizations. Forecast resource requirements based on project pipeline, identify capacity constraints, optimize staffing levels, and support go/no-go decisions on new project pursuits.
┌─────────────────────────────────────────────────────────────────┐
│ CAPACITY PLANNING │
├─────────────────────────────────────────────────────────────────┤
│ │
│ DEMAND FORECAST CAPACITY ANALYSIS DECISIONS │
│ ─────────────── ───────────────── ───────── │
│ │
│ Current Projects → Available: Pursue new │
│ • Project A (Active) 👷 PM: 5 project? │
│ • Project B (Active) 👷 Supers: 12 ──────── │
│ • Project C (Starting) 📐 Engineers: 8 ✅ Capacity │
│ ⚠️ Stretch │
│ Pipeline: → Required: ❌ Decline │
│ • Bid D (60% win) 👷 PM: 7 │
│ • Bid E (40% win) 👷 Supers: 15 │
│ • Opportunity F 📐 Engineers: 10 │
│ │
│ GAP ANALYSIS: ACTIONS: │
│ • PM: -2 (deficit) • Hire 2 PMs │
│ • Supers: -3 (deficit) • Promote from within │
│ • Engineers: -2 (deficit) • Partner with firm │
│ │
└─────────────────────────────────────────────────────────────────┘pythonfrom dataclasses import dataclass, field from typing import List, Dict, Optional, Tuple from datetime import datetime, timedelta from enum import Enum import statistics class ResourceRole(Enum): PROJECT_MANAGER = "project_manager" SUPERINTENDENT = "superintendent" PROJECT_ENGINEER = "project_engineer" ESTIMATOR = "estimator" SCHEDULER = "scheduler" SAFETY_MANAGER = "safety_manager" QC_MANAGER = "qc_manager" ADMIN = "admin" class ProjectPhase(Enum): PURSUIT = "pursuit" PRECONSTRUCTION = "preconstruction" CONSTRUCTION = "construction" CLOSEOUT = "closeout" class OpportunityStatus(Enum): IDENTIFIED = "identified" PURSUING = "pursuing" BID_SUBMITTED = "bid_submitted" NEGOTIATING = "negotiating" WON = "won" LOST = "lost" @dataclass class StaffMember: id: str name: str role: ResourceRole capacity: float = 1.0 # FTE current_assignment: str = "" availability_date: datetime = None skills: List[str] = field(default_factory=list) max_project_value: float = 0 # Max project size they can handle @dataclass class ProjectDemand: project_id: str project_name: str value: float phase: ProjectPhase start_date: datetime end_date: datetime probability: float = 1.0 # 1.0 for active, <1 for pipeline resource_needs: Dict[ResourceRole, float] = field(default_factory=dict) @dataclass class CapacityGap: role: ResourceRole period_start: datetime period_end: datetime demand: float capacity: float gap: float severity: str @dataclass class CapacityForecast: forecast_date: datetime horizon_months: int total_demand_fte: float total_capacity_fte: float utilization_pct: float gaps: List[CapacityGap] recommendations: List[str] class CapacityPlanner: """Plan organizational capacity for construction projects.""" # Typical staffing ratios by project value STAFFING_RATIOS = { ResourceRole.PROJECT_MANAGER: 20000000, # 1 PM per $20M ResourceRole.SUPERINTENDENT: 10000000, # 1 Super per $10M ResourceRole.PROJECT_ENGINEER: 15000000, # 1 PE per $15M ResourceRole.ESTIMATOR: 50000000, # 1 Estimator per $50M (pursuit) ResourceRole.SCHEDULER: 30000000, # 1 Scheduler per $30M ResourceRole.SAFETY_MANAGER: 25000000, # 1 Safety per $25M } # Phase factors (multiply by role ratio) PHASE_FACTORS = { ProjectPhase.PURSUIT: {"estimator": 1.5, "pm": 0.3}, ProjectPhase.PRECONSTRUCTION: {"pm": 0.7, "pe": 0.5, "scheduler": 0.5}, ProjectPhase.CONSTRUCTION: {"pm": 1.0, "super": 1.0, "pe": 1.0, "safety": 1.0}, ProjectPhase.CLOSEOUT: {"pm": 0.5, "pe": 0.3, "admin": 1.0} } def __init__(self, organization_name: str): self.organization_name = organization_name self.staff: Dict[str, StaffMember] = {} self.projects: Dict[str, ProjectDemand] = {} self.pipeline: Dict[str, ProjectDemand] = {} def add_staff(self, id: str, name: str, role: ResourceRole, capacity: float = 1.0, current_assignment: str = "", availability_date: datetime = None, max_project_value: float = 0) -> StaffMember: """Add staff member to capacity pool.""" member = StaffMember( id=id, name=name, role=role, capacity=capacity, current_assignment=current_assignment, availability_date=availability_date or datetime.now(), max_project_value=max_project_value ) self.staff[id] = member return member def add_active_project(self, id: str, name: str, value: float, phase: ProjectPhase, start_date: datetime, end_date: datetime) -> ProjectDemand: """Add active project to demand forecast.""" # Calculate resource needs based on value and phase needs = self._calculate_resource_needs(value, phase) project = ProjectDemand( project_id=id, project_name=name, value=value, phase=phase, start_date=start_date, end_date=end_date, probability=1.0, resource_needs=needs ) self.projects[id] = project return project def add_pipeline_opportunity(self, id: str, name: str, value: float, win_probability: float, expected_start: datetime, duration_months: int) -> ProjectDemand: """Add pipeline opportunity to demand forecast.""" needs = self._calculate_resource_needs(value, ProjectPhase.CONSTRUCTION) opportunity = ProjectDemand( project_id=id, project_name=name, value=value, phase=ProjectPhase.PURSUIT, start_date=expected_start, end_date=expected_start + timedelta(days=duration_months * 30), probability=win_probability, resource_needs=needs ) self.pipeline[id] = opportunity return opportunity def _calculate_resource_needs(self, value: float, phase: ProjectPhase) -> Dict[ResourceRole, float]: """Calculate resource needs based on project value and phase.""" needs = {} for role, ratio in self.STAFFING_RATIOS.items(): base_need = value / ratio # Apply phase factor phase_key = role.value.split('_')[0][:3] factor = 1.0 if phase in self.PHASE_FACTORS: factor = self.PHASE_FACTORS[phase].get(phase_key, 1.0) needs[role] = base_need * factor return needs def get_current_capacity(self) -> Dict[ResourceRole, float]: """Get current capacity by role.""" capacity = {role: 0.0 for role in ResourceRole} for member in self.staff.values(): if member.availability_date <= datetime.now(): capacity[member.role] += member.capacity return capacity def get_capacity_at_date(self, target_date: datetime) -> Dict[ResourceRole, float]: """Get projected capacity at future date.""" capacity = {role: 0.0 for role in ResourceRole} for member in self.staff.values(): if member.availability_date <= target_date: capacity[member.role] += member.capacity return capacity def calculate_demand(self, target_date: datetime, include_pipeline: bool = True, pipeline_threshold: float = 0.0) -> Dict[ResourceRole, float]: """Calculate resource demand at date.""" demand = {role: 0.0 for role in ResourceRole} # Active projects for project in self.projects.values(): if project.start_date <= target_date <= project.end_date: for role, need in project.resource_needs.items(): demand[role] += need * project.probability # Pipeline (weighted by probability) if include_pipeline: for opp in self.pipeline.values(): if opp.probability >= pipeline_threshold: if opp.start_date <= target_date <= opp.end_date: for role, need in opp.resource_needs.items(): demand[role] += need * opp.probability return demand def identify_gaps(self, horizon_months: int = 12) -> List[CapacityGap]: """Identify capacity gaps over forecast horizon.""" gaps = [] for month in range(horizon_months): period_start = datetime.now() + timedelta(days=month * 30) period_end = period_start + timedelta(days=30) capacity = self.get_capacity_at_date(period_start) demand = self.calculate_demand(period_start, include_pipeline=True) for role in ResourceRole: cap = capacity.get(role, 0) dem = demand.get(role, 0) gap = cap - dem if gap < 0: severity = "critical" if gap < -1 else "warning" gaps.append(CapacityGap( role=role, period_start=period_start, period_end=period_end, demand=dem, capacity=cap, gap=gap, severity=severity )) return gaps def can_pursue_project(self, value: float, start_date: datetime, duration_months: int) -> Dict: """Evaluate if organization can pursue new project.""" # Calculate needs for potential project needs = self._calculate_resource_needs(value, ProjectPhase.CONSTRUCTION) end_date = start_date + timedelta(days=duration_months * 30) # Check capacity over project duration can_staff = True bottlenecks = [] current_date = start_date while current_date <= end_date: capacity = self.get_capacity_at_date(current_date) demand = self.calculate_demand(current_date) for role, need in needs.items(): available = capacity.get(role, 0) - demand.get(role, 0) if need > available: can_staff = False bottlenecks.append({ "date": current_date, "role": role.value, "needed": need, "available": available, "gap": need - available }) current_date += timedelta(days=30) # Determine recommendation if can_staff: recommendation = "GO - Sufficient capacity" elif len(bottlenecks) <= 2: recommendation = "CONDITIONAL - Minor gaps, consider hiring" else: recommendation = "CAUTION - Significant capacity constraints" return { "can_staff": can_staff, "recommendation": recommendation, "resource_needs": {r.value: v for r, v in needs.items()}, "bottlenecks": bottlenecks[:10], "actions_required": self._suggest_hiring(bottlenecks) } def _suggest_hiring(self, bottlenecks: List[Dict]) -> List[str]: """Suggest hiring actions based on gaps.""" if not bottlenecks: return [] # Aggregate gaps by role role_gaps = {} for b in bottlenecks: role = b['role'] if role not in role_gaps: role_gaps[role] = 0 role_gaps[role] = max(role_gaps[role], b['gap']) actions = [] for role, gap in sorted(role_gaps.items(), key=lambda x: -x[1]): hires = int(gap) + 1 actions.append(f"Hire {hires} {role}(s) - Gap: {gap:.1f} FTE") return actions def generate_forecast(self, horizon_months: int = 12) -> CapacityForecast: """Generate capacity forecast.""" gaps = self.identify_gaps(horizon_months) # Calculate totals capacity = self.get_current_capacity() demand = self.calculate_demand(datetime.now()) total_capacity = sum(capacity.values()) total_demand = sum(demand.values()) utilization = (total_demand / total_capacity * 100) if total_capacity > 0 else 0 # Generate recommendations recommendations = [] if utilization > 90: recommendations.append("High utilization - consider hiring") elif utilization < 60: recommendations.append("Low utilization - review project pipeline") # Role-specific recommendations critical_gaps = [g for g in gaps if g.severity == "critical"] gap_roles = set(g.role.value for g in critical_gaps) for role in gap_roles: recommendations.append(f"Critical gap in {role} - immediate action needed") return CapacityForecast( forecast_date=datetime.now(), horizon_months=horizon_months, total_demand_fte=total_demand, total_capacity_fte=total_capacity, utilization_pct=utilization, gaps=gaps, recommendations=recommendations ) def generate_report(self) -> str: """Generate capacity planning report.""" forecast = self.generate_forecast() lines = [ "# Capacity Planning Report", "", f"**Organization:** {self.organization_name}", f"**Report Date:** {forecast.forecast_date.strftime('%Y-%m-%d')}", "", "## Executive Summary", "", f"| Metric | Value |", f"|--------|-------|", f"| Active Projects | {len(self.projects)} |", f"| Pipeline Opportunities | {len(self.pipeline)} |", f"| Total Staff | {len(self.staff)} |", f"| Current Capacity (FTE) | {forecast.total_capacity_fte:.1f} |", f"| Current Demand (FTE) | {forecast.total_demand_fte:.1f} |", f"| Utilization | {forecast.utilization_pct:.0f}% |", "", "## Capacity by Role", "", "| Role | Capacity | Demand | Gap |", "|------|----------|--------|-----|" ] capacity = self.get_current_capacity() demand = self.calculate_demand(datetime.now()) for role in ResourceRole: cap = capacity.get(role, 0) dem = demand.get(role, 0) gap = cap - dem gap_icon = "✅" if gap >= 0 else "⚠️" if gap > -1 else "🔴" lines.append( f"| {role.value} | {cap:.1f} | {dem:.1f} | {gap:+.1f} {gap_icon} |" ) # Active projects lines.extend([ "", "## Active Projects", "", "| Project | Value | Phase | End Date |", "|---------|-------|-------|----------|" ]) for p in sorted(self.projects.values(), key=lambda x: x.value, reverse=True): lines.append( f"| {p.project_name} | ${p.value:,.0f} | {p.phase.value} | " f"{p.end_date.strftime('%Y-%m-%d')} |" ) # Pipeline if self.pipeline: lines.extend([ "", "## Pipeline", "", "| Opportunity | Value | Probability | Expected Start |", "|-------------|-------|-------------|----------------|" ]) for p in sorted(self.pipeline.values(), key=lambda x: -x.probability): lines.append( f"| {p.project_name} | ${p.value:,.0f} | {p.probability:.0%} | " f"{p.start_date.strftime('%Y-%m-%d')} |" ) # Gaps critical_gaps = [g for g in forecast.gaps if g.severity == "critical"] if critical_gaps: lines.extend([ "", f"## Critical Capacity Gaps ({len(critical_gaps)})", "", "| Role | Period | Gap |", "|------|--------|-----|" ]) for gap in critical_gaps[:10]: lines.append( f"| {gap.role.value} | {gap.period_start.strftime('%Y-%m')} | " f"{gap.gap:.1f} FTE |" ) # Recommendations if forecast.recommendations: lines.extend([ "", "## Recommendations", "" ]) for rec in forecast.recommendations: lines.append(f"- {rec}") return "\n".join(lines)
pythonfrom datetime import datetime, timedelta # Initialize planner planner = CapacityPlanner("ABC Construction") # Add staff planner.add_staff("PM-001", "John Smith", ResourceRole.PROJECT_MANAGER) planner.add_staff("PM-002", "Jane Doe", ResourceRole.PROJECT_MANAGER) planner.add_staff("SUP-001", "Mike Johnson", ResourceRole.SUPERINTENDENT) planner.add_staff("SUP-002", "Bob Williams", ResourceRole.SUPERINTENDENT) planner.add_staff("SUP-003", "Tom Brown", ResourceRole.SUPERINTENDENT) planner.add_staff("PE-001", "Sarah Davis", ResourceRole.PROJECT_ENGINEER) planner.add_staff("PE-002", "Chris Wilson", ResourceRole.PROJECT_ENGINEER) # Add active projects planner.add_active_project( "PRJ-001", "Downtown Tower", value=25000000, phase=ProjectPhase.CONSTRUCTION, start_date=datetime(2024, 6, 1), end_date=datetime(2025, 12, 31) ) planner.add_active_project( "PRJ-002", "Hospital Wing", value=40000000, phase=ProjectPhase.CONSTRUCTION, start_date=datetime(2024, 9, 1), end_date=datetime(2026, 6, 30) ) # Add pipeline opportunities planner.add_pipeline_opportunity( "OPP-001", "Office Complex", value=30000000, win_probability=0.6, expected_start=datetime(2025, 3, 1), duration_months=18 ) # Check if can pursue new project evaluation = planner.can_pursue_project( value=20000000, start_date=datetime(2025, 6, 1), duration_months=12 ) print(f"Recommendation: {evaluation['recommendation']}") for action in evaluation['actions_required']: print(f" - {action}") # Generate forecast forecast = planner.generate_forecast() print(f"Utilization: {forecast.utilization_pct:.0f}%") print(f"Critical gaps: {len([g for g in forecast.gaps if g.severity == 'critical'])}") # Generate report print(planner.generate_report())
bashpip install (no external dependencies)
| Case | Status | Duration (ms) | Turns | Tokens | Tool calls | ||||||||
|---|---|---|---|---|---|---|---|---|---|---|---|---|---|
| Without | With | Δ | Without | With | Δ | Without | With | Δ | Without | With | Δ | ||
case-06 | pass→pass | 7,059 | 8,424 | +19% | 1 | 1 | 0% | 1,538 | 6,892 | +348% | 0 | 0 | — |
case-01 | fail→pass | 17,766 | 15,470 | -13% | 1 | 1 | 0% | 3,121 | 8,319 | +167% | 0 | 0 | — |
case-02 | fail→pass | 31,088 | 27,597 | -11% | 1 | 1 | 0% | 6,272 | 10,709 | +71% | 0 | 0 | — |
case-03 | fail→pass | 28,598 | 22,288 | -22% | 1 | 1 | 0% | 4,295 | 9,731 | +127% | 0 | 0 | — |
case-04 | pass→pass | 18,355 | 28,948 | +58% | 1 | 1 | 0% | 3,190 | 11,389 | +257% | 0 | 0 | — |
case-05 | pass→pass | 18,729 | 22,060 | +18% | 1 | 1 | 0% | 3,567 | 9,505 | +166% | 0 | 0 | — |
case-07 | fail→pass | 11,552 | 4,566 | -60% | 1 | 1 | 0% | 1,849 | 6,089 | +229% | 0 | 0 | — |
case-08 | fail→pass | 15,727 | 4,001 | -75% | 1 | 1 | 0% | 2,749 | 5,856 | +113% | 0 | 0 | — |
case-09 | fail→pass | 13,544 | 9,004 | -34% | 1 | 1 | 0% | 2,280 | 7,074 | +210% | 0 | 0 | — |
case-10 | fail→pass | 14,023 | 5,173 | -63% | 1 | 1 | 0% | 2,236 | 6,277 | +181% | 0 | 0 | — |
case-11 | pass→pass | 9,980 | 4,095 | -59% | 1 | 1 | 0% | 1,607 | 5,975 | +272% | 0 | 0 | — |
case-12 | pass→pass | 8,429 | 2,813 | -67% | 1 | 1 | 0% | 1,329 | 5,696 | +329% | 0 | 0 | — |
case-13 | pass→pass | 8,465 | 3,942 | -53% | 1 | 1 | 0% | 1,415 | 5,922 | +319% | 0 | 0 | — |
case-14 | pass→pass | 16,196 | 3,524 | -78% | 1 | 1 | 0% | 1,253 | 5,813 | +364% | 0 | 0 | — |
case-15 | fail→pass | 11,174 | 4,796 | -57% | 1 | 1 | 0% | 1,587 | 5,956 | +275% | 0 | 0 | — |
case-16 | pass→pass | 11,389 | 5,228 | -54% | 1 | 1 | 0% | 1,658 | 6,029 | +264% | 0 | 0 | — |
case-17 | pass→pass | 9,983 | 6,081 | -39% | 1 | 1 | 0% | 1,411 | 6,041 | +328% | 0 | 0 | — |
case-18 | fail→pass | 13,059 | 3,513 | -73% | 1 | 1 | 0% | 2,071 | 5,830 | +182% | 0 | 0 | — |
case-19 | fail→pass | 12,668 | 4,856 | -62% | 1 | 1 | 0% | 1,917 | 6,027 | +214% | 0 | 0 | — |
case-20 | pass→pass | 8,270 | 6,032 | -27% | 1 | 1 | 0% | 1,242 | 6,181 | +398% | 0 | 0 | — |
case-21 | pass→pass | 7,664 | 5,186 | -32% | 1 | 1 | 0% | 1,160 | 6,015 | +419% | 0 | 0 | — |
case-22 | pass→pass | 6,059 | 2,952 | -51% | 1 | 1 | 0% | 932 | 5,773 | +519% | 0 | 0 | — |
DecimalAI ran this skill against gemini-3.6-flash twice over the same eval suite — once with the skill loaded and once without — and compared the two runs case by case. 22 cases were attempted. The headline lift of +45 percentage points is the difference between those two pass rates over the 22 comparable cases.
Without the skill loaded, the model failed this case. With it loaded, the same prompt on the same model passed. This is one improved case from the latest verified run; every case, including any that regressed, is in the table above.
Other measured skills in the registry, with their headline benchmark lift.