Automatically extract patterns, best practices, and reusable knowledge from construction automation sessions to improve future performance.
SkillScore77Maintained
Automatic
◆Knowledge Management pack
Last verified 8/23/2026
What it changes
Passed 17 of 22 test cases with the skill, and 3 of 22 without it.
Without skill14%
With skill77%
Checks it passed that the model alone missed
The maximum delay cap is set to 32 seconds
Floors 6 through 15 use a multiplier of 1.15x
Floors 1 through 5 use a base multiplier of 1.0x
and 17 more in the full report
14 fixed3 passed either way5 still failing0 broke
Pass-rate lift
+64 pp
Tokens
+81%
Agent turns
0%
Response time
-41%
Model gemini-3.6-flashMeasured 8/23/2026v117 of 22 cases passed with skill
Tokens, turns and time describe resource use, not a dollar price.
See it in action
One of 14 test cases the skill fixed. Same model, same prompt, with and without the skill.
1 of 14
Prompt
When suggest_approaches is called with a task context, how many top suggestions are returned to the user?
What was checked, without and with the skill
Checked
Without skill
With skill
The function limits the return list to the top 5 relevant suggestions
Missed
Passed
case-13 · gemini-3.6-flash · 8/23/2026 · answers are capped and redacted
What's inside
The instructions your model reads when the skill loads.
SKILL.md358 linessingle file
Continuous Learning for Construction Automation
This skill enables automatic extraction of valuable patterns, solutions, and best practices from construction automation sessions to build institutional knowledge.
When to Use
Activate this skill:
At the end of complex estimation sessions
After solving non-trivial data processing problems