Forecast project outcomes using historical data: cost overruns, schedule delays, risk probabilities. Machine learning models for construction prediction.
SkillScore74Maintained
Automatic
◆Data Analyst pack
Last verified 8/23/2026
What it changes
Passed 17 of 23 test cases with the skill, and 9 of 23 without it.
Without skill39%
With skill74%
Checks it passed that the model alone missed
Fills missing feature values with zero.
Splits data using test_size equal to 0.2.
Sets random_state equal to 42 for data splitting.
and 9 more in the full report
8 fixed9 passed either way6 still failing0 broke
Pass-rate lift
+35 pp
Tokens
+121%
Agent turns
0%
Response time
-18%
Model gemini-3.6-flashMeasured 8/23/2026v117 of 23 cases passed with skill
Tokens, turns and time describe resource use, not a dollar price.
See it in action
One of 8 test cases the skill fixed. Same model, same prompt, with and without the skill.
1 of 8
Prompt
In the construction cost overrun prediction output, what target threshold percentage triggers a high overrun risk factor warning in the output list?
What was checked, without and with the skill
Checked
Without skill
With skill
Flags a high overrun risk warning when predicted overrun exceeds 10 percent.
Missed
Passed
case-12 · gemini-3.6-flash · 8/23/2026 · answers are capped and redacted
What's inside
The instructions your model reads when the skill loads.
SKILL.md402 linessingle file
Predictive Analytics for Construction
Overview
Use historical project data to predict future outcomes: cost overruns, schedule delays, quality issues, and risks. Apply machine learning models tailored for construction industry patterns.
Monitor construction progress using computer vision. Analyze site photos and drone imagery to track work completion, detect safety issues, and compare against BIM models.