Optimize shared resource pools across multiple construction projects. Balance resource allocation, minimize conflicts, and maximize utilization across the portfolio.
Passed 22 of 23 test cases with the skill, and 13 of 23 without it.
and 7 more in the full report
9 fixed14 passed either way1 still failing0 broke
Tokens, turns and time describe resource use, not a dollar price.
One of 8 test cases the skill fixed. Same model, same prompt, with and without the skill.
When registering resource requests for project 'PRJ-102' in an automated construction pool manager where 2 requests already exist, what identifier string should be generated for the newly created request?
| Checked | Without skill | With skill |
|---|---|---|
| Generates request ID REQ-PRJ-102-003 | Missed | Passed |
The instructions your model reads when the skill loads.
Manage and optimize shared resources (equipment, specialized labor, materials) across multiple construction projects. Identify conflicts, balance allocations, and maximize resource utilization while minimizing idle time and project delays.
┌─────────────────────────────────────────────────────────────────┐
│ RESOURCE POOL OPTIMIZATION │
├─────────────────────────────────────────────────────────────────┤
│ │
│ RESOURCE POOL PROJECTS │
│ ───────────── ──────── │
│ 🏗️ Tower Crane A ───────────→ Project 1 (Weeks 1-8) │
│ 🏗️ Tower Crane B ───────────→ Project 2 (Weeks 3-12) │
│ 🔧 Excavator Fleet ─────┬─────→ Project 1 (Weeks 1-4) │
│ └─────→ Project 3 (Weeks 5-10) │
│ 👷 Steel Crew A ───────────→ Project 2 (Weeks 6-15) │
│ 👷 Steel Crew B ─────┬─────→ Project 1 (Weeks 8-14) │
│ └─────→ Project 3 (Weeks 15-20) │
│ │
│ OPTIMIZATION GOALS: │
│ • Minimize idle time between projects │
│ • Avoid double-booking conflicts │
│ • Prioritize critical path activities │
│ • Balance utilization across resources │
│ │
└─────────────────────────────────────────────────────────────────┘
from dataclasses import dataclass, field
from typing import List, Dict, Optional, Tuple, Set
from datetime import datetime, timedelta
from enum import Enum
import heapq
test cases passed, vs 13 / 23 without