Install any skill in seconds. Free to start, no credit card required.
Get Started Free →datadrivenconstruction/schedule-cost-link
Link schedule activities to cost items. Create cost-loaded schedules, generate cash flow curves, and track earned value.
Passed 20 of 23 test cases with the skill, and 15 of 23 without it.
and 5 more in the full report
5 fixed15 passed either way3 still failing0 broke
Tokens, turns and time describe resource use, not a dollar price.
One of 5 test cases the skill fixed. Same model, same prompt, with and without the skill.
For an activity with a duration of 10 days, what weight factor does the bell curve distribution assign to a day located exactly at the duration midpoint?
| Checked | Without skill | With skill |
|---|---|---|
| Assigns a midpoint weight factor of 1.0. | Missed | Passed |
The instructions your model reads when the skill loads.
Integrating schedule and cost requires:
Systematic linkage between schedule activities and cost data to enable integrated project control.
import pandas as pd
import numpy as np
from typing import Dict, Any, List, Optional, Tuple
from dataclasses import dataclass, field
from datetime import date, timedelta
from enum import Enum
from collections import defaultdict
class LoadingMethod(Enum):
UNIFORM = "uniform" # Even distribution
FRONT_LOADED = "front_loaded"
BACK_LOADED = "back_loaded"
BELL_CURVE = "bell_curve"
@dataclass
class ScheduleActivity:
activity_id: str
name: str
start_date: date
finish_date: date
duration: int
test cases passed, vs 15 / 23 without
Published skills whose descriptions closely match this one, with their headline benchmark lift.
More skills from the same source and nearby in the registry, with their headline benchmark lift.