风险评估方法,识别项目风险并制定应对策略
Passed 21 of 22 test cases with the skill, and 10 of 22 without it.
and 11 more in the full report
11 fixed10 passed either way1 still failing0 broke
Tokens, turns and time describe resource use, not a dollar price.
One of 11 test cases the skill fixed. Same model, same prompt, with and without the skill.
请将以下 4 个项目隐患精准划入标准四类风险中:1. 实习生独立负责核心模块(人力);2. 供应商物流 API 经常超时(外部);3. 产品方案缺少验收标准(需求);4. 选用了不成熟的开源数据库(选型)。
| Checked | Without skill | With skill |
|---|---|---|
| Classifies item 1 as '资源风险', item 2 as '依赖风险', item 3 as '需求风险', and item 4 as '技术风险'. | Missed | Passed |
| Uses standard category terms without introducing custom category names. | Passed | Passed |
The instructions your model reads when the skill loads.
| 风险类型 | 示例 |
|---|---|
| 技术风险 | 新技术不熟悉、技术选型不当 |
| 资源风险 | 人员不足、时间紧张 |
| 需求风险 | 需求不明确、需求变更频繁 |
| 依赖风险 | 外部API不稳定、第三方服务延迟 |
| 可能性 \ 影响 | 低 | 中 | 高 |
|---|---|---|---|
| 高 | 中风险 | 高风险 | 高风险 |
| 中 | 低风险 | 中风险 | 高风险 |
| 低 | 低风险 | 低风险 | 中风险 |
| 策略 | 说明 | 适用场景 |
|---|---|---|
| 规避 | 改变计划避免风险 | 高风险且可避免 |
| 减轻 | 降低风险发生概率或影响 | 中高风险 |
| 转移 | 将风险转移给第三方 | 外部依赖风险 |
| 接受 | 接受风险并准备应对 | 低风险 |
test cases passed, vs 10 / 22 without