Install any skill in seconds. Free to start, no credit card required.
Get Started Free →Use when planning an ATC (ACM SIGOPS Annual Technical Conference, formerly USENIX ATC) campaign end to end — running the year backward from the early-June deadline through the two review rounds, the rebuttal, conditional-acceptance shepherding, the post-acceptance artifact evaluation, and the ACM Open Access camera-ready for the November Hong Kong conference.
| Test case | Without → With | Effect | Δ tokens | Δ turns |
|---|---|---|---|---|
| case-01 | ✗→✓ | ▲ Improved | 66% | 0% |
| case-02 | ✗→✓ | ▲ Improved | 37% | 0% |
| case-03 | ✗→✓ | ▲ Improved | 14% | 0% |
| case-07 | ✗→✓ | ▲ Improved | 31% | 0% |
| case-08 | ✗→✓ | ▲ Improved | 8% | 0% |
Plan the campaign backward from the deadline. ATC 2026 — the first ACM SIGOPS edition of the former USENIX ATC — runs on a calendar and a review structure that both changed in the transition: an early-June 2026 submission deadline (AoE; 1 vs. 10 June unresolved across renderings — 待核实), a two-round, extended-abstract review, conditional acceptance with shepherding, a separate artifact-evaluation track, and the conference in Hong Kong, 15-18 November 2026. Reopen the SIGOPS call for the exact dates before committing to any of the offsets below.
text[T-0 Submission] paired upload: 2-page extended abstract + full paper on atc26.hotcrp.com [Round one] two reviewers judge each extended abstract; below-bar papers cut early [Round two] 3-4 reviewers read the full paper of survivors [Rebuttal] ~1 page: correct factual misreadings; note prior-submission changes if any [Decision] conditional accept / reject [Shepherding] a PC shepherd signs off required revisions before final acceptance [Artifact evaluation] separate post-acceptance AEC track -> Available / Functional / Reproduced [Camera-ready] de-anonymize, satisfy shepherd, ACM Open Access metadata + production checks [Nov 15-18] present at the Hong Kong conference; talk video/slides per the venue norm
and measurements are the long pole; leave prose churn for later. Pin environments now (atc-reproducibility) — provenance cannot be reconstructed at the deadline.
atc-writing-style; baselines and honest costsin place per atc-experiments.
surface. Have someone read only the abstract and tell you the problem, contribution, testbed, and result. If they cannot, fix it.
conflicts; confirm the exact AoE deadline day.
the abstract is your entire round-one argument. Do not start major new experiments hoping to swap in a stronger paper mid-cycle.
and clarifications a skeptical reviewer would ask for, so the ~1-page window is spent well (atc-author-response).
declining it; the shepherd holds final acceptance until satisfied.
deadline, independent of the camera-ready (atc-artifact-evaluation). De-anonymize and archive the artifact in a DOI-issuing repository for the Available badge.
ACM Open Access metadata (atc-camera-ready). Budget for the transition APC (subsidized for 2026; exact figure per the ACM/SIGOPS terms).
text[Deadline] confirm the exact early-June AoE day on the SIGOPS call (1 vs 10 June — 待核实) [Conference] Hong Kong (Hyatt, Shatin), Nov 15-18, 2026 — plan travel/visa early for HK [Rotation] under SIGOPS, ATC rotates Asia/Europe/North America; next-year location differs [Artifact] find the AEC submission date on the call for artifacts (separate from camera-ready) [Backup] if rejected, line up OSDI/NSDI/EuroSys/FAST dates via atc-topic-selection
text[ATC workflow stage] planning / drafting / abstract-hardening / submitted / round two / rebuttal / shepherding / artifact / camera-ready [Critical path] the long-pole task (usually testbed + measurements, then the extended abstract) [Deadline set] submission (early June AoE), rebuttal, shepherd sign-off, artifact, camera-ready [Next action] the single most schedule-critical step, with a date [Risk] the item most likely to slip (provenance pinning / abstract self-containment / shepherd changes)
Other measured skills in the registry, with their headline benchmark lift.