Get Started Free →Compress construction schedules using crashing and fast-tracking techniques. Analyze cost-time tradeoffs and find optimal acceleration strategies.
.claude/skills/datadrivenconstruction-schedule-compression/SKILL.md| Test case | Without → With | Effect | Δ tokens | Δ turns |
|---|---|---|---|---|
| case-01 | ✗→✓ | ▲ Improved | 182% | 0% |
| case-02 | ✗→✓ | ▲ Improved | 83% | 0% |
| case-03 | ✗→✓ | ▲ Improved | 332% | 0% |
| case-08 | ✗→✓ | ▲ Improved | 401% | 0% |
| case-13 | ✗→✓ | ▲ Improved | 196% | 0% |
Compress construction schedules when project deadlines are at risk. Apply crashing (adding resources) and fast-tracking (parallel activities) to accelerate delivery while managing cost and risk.
> "Strategic compression can recover 20% of schedule with 10% cost increase" — DDC Community
┌─────────────────────────────────────────────────────────────────┐
│ SCHEDULE COMPRESSION │
├─────────────────────────────────────────────────────────────────┤
│ │
│ CRASHING FAST-TRACKING │
│ ──────── ───────────── │
│ Add resources to reduce Overlap sequential │
│ activity duration activities │
│ │
│ Before: ████████ (10d) Before: A ──→ B ──→ C │
│ After: █████ (5d) + $$$ After: A ──→ B │
│ └──→ C │
│ Cost: Higher labor/OT Risk: Rework if A changes │
│ │
└─────────────────────────────────────────────────────────────────┘pythonfrom dataclasses import dataclass, field from typing import List, Dict, Optional, Tuple from enum import Enum class CompressionMethod(Enum): CRASH = "crash" FAST_TRACK = "fast_track" HYBRID = "hybrid" @dataclass class Activity: id: str name: str normal_duration: int crash_duration: int # Minimum possible duration normal_cost: float crash_cost: float # Cost at crash duration predecessors: List[str] = field(default_factory=list) is_critical: bool = False current_duration: int = 0 def __post_init__(self): if self.current_duration == 0: self.current_duration = self.normal_duration @property def crash_slope(self) -> float: """Cost per day of crashing.""" duration_diff = self.normal_duration - self.crash_duration if duration_diff == 0: return float('inf') return (self.crash_cost - self.normal_cost) / duration_diff @property def days_available_to_crash(self) -> int: """Days activity can still be crashed.""" return self.current_duration - self.crash_duration @dataclass class FastTrackOption: activity1_id: str activity2_id: str overlap_days: int risk_level: str # low, medium, high risk_description: str rework_probability: float potential_rework_cost: float @dataclass class CompressionPlan: target_reduction: int achieved_reduction: int crash_activities: List[Tuple[str, int]] # (activity_id, days_crashed) fast_track_options: List[FastTrackOption] total_additional_cost: float new_project_duration: int risk_assessment: str class ScheduleCompressor: """Compress construction schedules using crashing and fast-tracking.""" def __init__(self): self.activities: Dict[str, Activity] = {} self.fast_track_options: List[FastTrackOption] = [] self.project_duration: int = 0 self.critical_path: List[str] = [] def add_activity(self, id: str, name: str, normal_duration: int, crash_duration: int, normal_cost: float, crash_cost: float, predecessors: List[str] = None, is_critical: bool = False) -> Activity: """Add activity with crash data.""" activity = Activity( id=id, name=name, normal_duration=normal_duration, crash_duration=crash_duration, normal_cost=normal_cost, crash_cost=crash_cost, predecessors=predecessors or [], is_critical=is_critical ) self.activities[id] = activity return activity def add_fast_track_option(self, activity1_id: str, activity2_id: str, overlap_days: int, risk_level: str, risk_description: str, rework_probability: float = 0.1, potential_rework_cost: float = 0) -> FastTrackOption: """Add fast-tracking option between activities.""" option = FastTrackOption( activity1_id=activity1_id, activity2_id=activity2_id, overlap_days=overlap_days, risk_level=risk_level, risk_description=risk_description, rework_probability=rework_probability, potential_rework_cost=potential_rework_cost ) self.fast_track_options.append(option) return option def calculate_project_duration(self) -> int: """Calculate current project duration using CPM.""" # Simple forward pass finish_times = {} def get_finish(act_id: str) -> int: if act_id in finish_times: return finish_times[act_id] act = self.activities[act_id] if not act.predecessors: start = 0 else: start = max(get_finish(p) for p in act.predecessors) finish_times[act_id] = start + act.current_duration return finish_times[act_id] for act_id in self.activities: get_finish(act_id) self.project_duration = max(finish_times.values()) if finish_times else 0 return self.project_duration def identify_critical_path(self) -> List[str]: """Identify critical path activities.""" # Simplified - in practice, use full CPM self.calculate_project_duration() # Mark activities with zero float as critical critical = [act.id for act in self.activities.values() if act.is_critical] self.critical_path = critical return critical def analyze_crash_options(self) -> List[Dict]: """Analyze all crashing options sorted by cost efficiency.""" crash_options = [] for act in self.activities.values(): if act.days_available_to_crash > 0 and act.is_critical: crash_options.append({ 'activity_id': act.id, 'activity_name': act.name, 'crash_slope': act.crash_slope, 'max_days': act.days_available_to_crash, 'current_duration': act.current_duration, 'crash_duration': act.crash_duration }) # Sort by crash slope (cost per day) return sorted(crash_options, key=lambda x: x['crash_slope']) def crash_schedule(self, target_days: int, max_budget: float = float('inf')) -> CompressionPlan: """Crash schedule to reduce duration by target days.""" self.calculate_project_duration() original_duration = self.project_duration crashed_activities = [] total_cost = 0 days_achieved = 0 # Get crash options options = self.analyze_crash_options() while days_achieved < target_days and options: # Find cheapest option best_option = None for opt in options: if opt['max_days'] > 0: best_option = opt break if not best_option: break # Crash by 1 day act = self.activities[best_option['activity_id']] crash_cost = act.crash_slope if total_cost + crash_cost > max_budget: break act.current_duration -= 1 total_cost += crash_cost days_achieved += 1 # Update option best_option['max_days'] -= 1 # Track what was crashed existing = next((c for c in crashed_activities if c[0] == act.id), None) if existing: crashed_activities.remove(existing) crashed_activities.append((act.id, existing[1] + 1)) else: crashed_activities.append((act.id, 1)) # Refresh options (critical path may change) options = self.analyze_crash_options() new_duration = self.calculate_project_duration() return CompressionPlan( target_reduction=target_days, achieved_reduction=days_achieved, crash_activities=crashed_activities, fast_track_options=[], total_additional_cost=total_cost, new_project_duration=new_duration, risk_assessment="Low risk - crashing uses proven methods" ) def fast_track_schedule(self, target_days: int, max_risk: str = "medium") -> CompressionPlan: """Fast-track schedule by overlapping activities.""" risk_order = {"low": 1, "medium": 2, "high": 3} max_risk_level = risk_order.get(max_risk, 2) # Filter options by risk level viable_options = [ opt for opt in self.fast_track_options if risk_order.get(opt.risk_level, 3) <= max_risk_level ] # Sort by overlap (most time saved first) viable_options.sort(key=lambda x: -x.overlap_days) selected_options = [] total_overlap = 0 total_risk_cost = 0 for opt in viable_options: if total_overlap >= target_days: break selected_options.append(opt) total_overlap += opt.overlap_days total_risk_cost += opt.rework_probability * opt.potential_rework_cost self.calculate_project_duration() new_duration = self.project_duration - total_overlap risk_text = "High risk" if max_risk == "high" else "Moderate risk" if max_risk == "medium" else "Low risk" return CompressionPlan( target_reduction=target_days, achieved_reduction=total_overlap, crash_activities=[], fast_track_options=selected_options, total_additional_cost=total_risk_cost, new_project_duration=new_duration, risk_assessment=f"{risk_text} - potential rework if predecessor changes" ) def optimize_compression(self, target_days: int, max_budget: float, max_risk: str = "medium") -> CompressionPlan: """Find optimal combination of crashing and fast-tracking.""" # Try crash-only crash_plan = self.crash_schedule(target_days, max_budget) if crash_plan.achieved_reduction >= target_days: return crash_plan # Need additional fast-tracking remaining_days = target_days - crash_plan.achieved_reduction remaining_budget = max_budget - crash_plan.total_additional_cost fast_track_plan = self.fast_track_schedule(remaining_days, max_risk) # Combine plans total_reduction = crash_plan.achieved_reduction + fast_track_plan.achieved_reduction total_cost = crash_plan.total_additional_cost + fast_track_plan.total_additional_cost return CompressionPlan( target_reduction=target_days, achieved_reduction=total_reduction, crash_activities=crash_plan.crash_activities, fast_track_options=fast_track_plan.fast_track_options, total_additional_cost=total_cost, new_project_duration=self.project_duration - total_reduction, risk_assessment="Combined approach - balance of cost and risk" ) def generate_cost_curve(self, max_compression: int) -> List[Dict]: """Generate time-cost tradeoff curve.""" curve = [] self.calculate_project_duration() original_duration = self.project_duration # Reset all activities to normal for act in self.activities.values(): act.current_duration = act.normal_duration base_cost = sum(act.normal_cost for act in self.activities.values()) curve.append({ 'duration': original_duration, 'cost': base_cost, 'compression': 0 }) for days in range(1, max_compression + 1): # Reset and crash by 'days' for act in self.activities.values(): act.current_duration = act.normal_duration plan = self.crash_schedule(days) if plan.achieved_reduction < days: break curve.append({ 'duration': plan.new_project_duration, 'cost': base_cost + plan.total_additional_cost, 'compression': days }) return curve def generate_compression_report(self, plan: CompressionPlan) -> str: """Generate compression analysis report.""" lines = [ "# Schedule Compression Report", "", f"**Target Reduction:** {plan.target_reduction} days", f"**Achieved Reduction:** {plan.achieved_reduction} days", f"**New Duration:** {plan.new_project_duration} days", f"**Additional Cost:** ${plan.total_additional_cost:,.0f}", "", f"## Risk Assessment", f"{plan.risk_assessment}", "" ] if plan.crash_activities: lines.append("## Crashed Activities") lines.append("") lines.append("| Activity | Days Crashed | Cost Impact |") lines.append("|----------|--------------|-------------|") for act_id, days in plan.crash_activities: act = self.activities[act_id] cost = days * act.crash_slope lines.append(f"| {act.name} | {days} | ${cost:,.0f} |") lines.append("") if plan.fast_track_options: lines.append("## Fast-Tracked Activities") lines.append("") for opt in plan.fast_track_options: lines.append(f"- **{opt.activity1_id} → {opt.activity2_id}**: {opt.overlap_days} days overlap") lines.append(f" - Risk: {opt.risk_level} - {opt.risk_description}") lines.append("") return "\n".join(lines)
python# Initialize compressor compressor = ScheduleCompressor() # Add activities with crash data compressor.add_activity( "A", "Foundation", normal_duration=20, crash_duration=15, normal_cost=100000, crash_cost=130000, is_critical=True ) compressor.add_activity( "B", "Steel Erection", normal_duration=30, crash_duration=22, normal_cost=200000, crash_cost=260000, predecessors=["A"], is_critical=True ) compressor.add_activity( "C", "MEP Rough-in", normal_duration=25, crash_duration=20, normal_cost=150000, crash_cost=180000, predecessors=["B"], is_critical=True ) # Add fast-track options compressor.add_fast_track_option( "A", "B", overlap_days=5, risk_level="medium", risk_description="Steel may need rework if foundation changes", rework_probability=0.15, potential_rework_cost=30000 ) # Analyze crash options print("Crash Options (sorted by cost/day):") for opt in compressor.analyze_crash_options(): print(f" {opt['activity_name']}: ${opt['crash_slope']:.0f}/day, max {opt['max_days']} days") # Compress schedule by 15 days plan = compressor.optimize_compression( target_days=15, max_budget=80000, max_risk="medium" ) print(compressor.generate_compression_report(plan)) # Generate cost curve curve = compressor.generate_cost_curve(20) for point in curve: print(f"Duration: {point['duration']}d, Cost: ${point['cost']:,.0f}")
bashpip install (no external dependencies)
| Case | Status | Duration (ms) | Turns | Tokens | Tool calls | ||||||||
|---|---|---|---|---|---|---|---|---|---|---|---|---|---|
| Without | With | Δ | Without | With | Δ | Without | With | Δ | Without | With | Δ | ||
case-01 | fail→pass | 46,544 | 37,181 | -20% | 1 | 1 | 0% | 3,416 | 9,620 | +182% | 0 | 0 | — |
case-02 | fail→pass | 18,683 | 16,352 | -12% | 1 | 1 | 0% | 4,122 | 7,557 | +83% | 0 | 0 | — |
case-03 | fail→pass | 24,284 | 15,987 | -34% | 1 | 1 | 0% | 1,906 | 8,238 | +332% | 0 | 0 | — |
case-04 | pass→pass | 5,922 | 5,648 | -5% | 1 | 1 | 0% | 1,359 | 5,397 | +297% | 0 | 0 | — |
case-05 | pass→pass | 4,095 | 4,389 | +7% | 1 | 1 | 0% | 885 | 4,964 | +461% | 0 | 0 | — |
case-06 | pass→pass | 2,883 | 3,753 | +30% | 1 | 1 | 0% | 593 | 4,875 | +722% | 0 | 0 | — |
case-07 | pass→pass | 6,077 | 4,640 | -24% | 1 | 1 | 0% | 1,225 | 5,051 | +312% | 0 | 0 | — |
case-08 | fail→pass | 5,023 | 5,613 | +12% | 1 | 1 | 0% | 1,029 | 5,154 | +401% | 0 | 0 | — |
case-09 | pass→pass | 4,865 | 3,314 | -32% | 1 | 1 | 0% | 879 | 4,737 | +439% | 0 | 0 | — |
case-10 | pass→pass | 8,906 | 7,911 | -11% | 1 | 1 | 0% | 1,869 | 5,877 | +214% | 0 | 0 | — |
case-11 | pass→pass | 3,554 | 3,284 | -8% | 1 | 1 | 0% | 711 | 4,736 | +566% | 0 | 0 | — |
case-12 | pass→pass | 4,684 | 4,213 | -10% | 1 | 1 | 0% | 873 | 4,916 | +463% | 0 | 0 | — |
case-13 | fail→pass | 8,736 | 3,988 | -54% | 1 | 1 | 0% | 1,620 | 4,790 | +196% | 0 | 0 | — |
case-14 | pass→pass | 1,928 | 2,322 | +20% | 1 | 1 | 0% | 388 | 4,557 | +1074% | 0 | 0 | — |
case-15 | pass→pass | 4,451 | 3,639 | -18% | 1 | 1 | 0% | 934 | 4,900 | +425% | 0 | 0 | — |
case-16 | pass→pass | 9,508 | 2,707 | -72% | 1 | 1 | 0% | 1,475 | 4,535 | +207% | 0 | 0 | — |
case-17 | pass→pass | 6,579 | 5,443 | -17% | 1 | 1 | 0% | 1,248 | 5,181 | +315% | 0 | 0 | — |
case-18 | fail→pass | 7,334 | 5,128 | -30% | 1 | 1 | 0% | 1,416 | 5,127 | +262% | 0 | 0 | — |
case-19 | pass→pass | 4,708 | 3,843 | -18% | 1 | 1 | 0% | 994 | 4,968 | +400% | 0 | 0 | — |
case-20 | pass→pass | 12,095 | 8,717 | -28% | 1 | 1 | 0% | 2,423 | 5,839 | +141% | 0 | 0 | — |
case-21 | pass→pass | 14,544 | 12,945 | -11% | 1 | 1 | 0% | 3,065 | 6,873 | +124% | 0 | 0 | — |
case-22 | pass→pass | 13,445 | 19,841 | +48% | 1 | 1 | 0% | 2,607 | 8,029 | +208% | 0 | 0 | — |
DecimalAI ran this skill against gemini-3.6-flash twice over the same eval suite — once with the skill loaded and once without — and compared the two runs case by case. 22 cases were attempted, and 20 counted toward the lift figure. The other 2 produced results that are not comparable between the two arms, so they are excluded from the headline rather than averaged into it. The headline lift of +27 percentage points is the difference between those two pass rates over the 20 comparable cases.
Without the skill loaded, the model failed this case. With it loaded, the same prompt on the same model passed. This is one improved case from the latest verified run; every case, including any that regressed, is in the table above.
Other measured skills in the registry, with their headline benchmark lift.