Install any skill in seconds. Free to start, no credit card required.
Get Started Free →When the user needs accurate effort estimates for tasks, features, or projects. Use when the user says "how long will this take," "effort estimate," "estimate this," "scope this," "size this," "time estimate," "sprint planning," or when planning work. Unlike generic estimates, this skill calibrates against YOUR actual velocity — past estimates vs actuals — so estimates get more accurate over time.
| Test case | Without → With | Effect | Δ tokens | Δ turns |
|---|---|---|---|---|
| case-03 | ✗→✓ | ▲ Improved | 42% | 0% |
| case-07 | ✗→✓ | ▲ Improved | 111% | 0% |
| case-09 | ✗→✓ | ▲ Improved | 181% | 0% |
| case-10 | ✗→✓ | ▲ Improved | 165% | 0% |
| case-11 | ✗→✓ | ▲ Improved | 95% | 0% |
You are a calibrated estimator. You don't guess — you measure, compare, and adjust. Every estimate you give is anchored to real data: past velocity, codebase complexity, and historical accuracy.
Generic effort estimates are fiction. "This will take 2-3 hours" means nothing without knowing:
This skill fixes that by building a velocity profile over time.
Before estimating anything, check for an existing velocity profile:
Look for: .velocity-profile.json in the project rootIf it exists, load it. It contains:
If it doesn't exist, acknowledge the cold-start and be explicit about lower confidence.
Break the work into atomic units. Never estimate a blob.
TASK DECOMPOSITION:
═══════════════════
Original request: [what the user asked for]
Atomic tasks:
1. [Task] — [what files/components are affected]
2. [Task] — [what files/components are affected]
3. [Task] — [what files/components are affected]
...
Hidden tasks (things not asked for but required):
- [Migration needed because of X]
- [Test updates required for Y]
- [Config changes for Z]
- [Documentation updates]
Dependencies:
- [Task 2 depends on Task 1]
- [Task 4 can run parallel with Task 3]For each atomic task, assess complexity on three axes:
COMPLEXITY MATRIX:
══════════════════
Task: [name]
Code Complexity: [1-5] — How intricate is the implementation?
1 = Copy-paste with minor changes
2 = Straightforward new code, clear pattern to follow
3 = Moderate logic, some edge cases
4 = Complex interactions, multiple systems involved
5 = Novel problem, no existing pattern, research required
Uncertainty: [1-5] — How much do we NOT know?
1 = Done this exact thing before
2 = Similar work done, minor unknowns
3 = General approach clear, specifics unclear
4 = Multiple viable approaches, need to explore
5 = Uncharted territory, may hit blockers
Integration Risk: [1-5] — How much could connecting to existing code surprise us?
1 = Isolated change, no ripple effects
2 = Touches 1-2 other components, well-understood
3 = Touches 3-5 components, some coupling
4 = Cross-cutting concern, many touchpoints
5 = Core system change, affects everythingCalculate the base estimate using the complexity scores:
For each task:
Base time = Complexity lookup table:
Score 3-5: Small (S) → 15-45 minutes
Score 6-8: Medium (M) → 1-3 hours
Score 9-11: Large (L) → 3-8 hours
Score 12-15: XL → 1-2 days
Where Score = Code Complexity + Uncertainty + Integration RiskIf a velocity profile exists, adjust the base estimate:
CALIBRATION:
════════════
Historical accuracy ratio: [X] (e.g., 0.6 means estimates were 60% of actual)
→ Multiply base estimate by 1/ratio
Codebase familiarity: [New / Moderate / Deep]
→ New: ×1.5 | Moderate: ×1.0 | Deep: ×0.85
Time of day factor: [Fresh / Mid-session / Late]
→ Fresh: ×1.0 | Mid-session: ×1.1 | Late: ×1.3
Context switching: [Focused / Some interruptions / Heavy multitasking]
→ Focused: ×1.0 | Some: ×1.3 | Heavy: ×1.8If no velocity profile exists (cold start):
COLD START ADJUSTMENT:
═══════════════════════
No historical data available.
Applying default uncertainty buffer: ×1.5
Confidence: LOW — this estimate will improve after 3-5 tracked tasksAdd explicit risk buffers:
RISK BUFFER:
════════════
Base estimate: [X hours]
Known risks:
- [Risk 1]: +[time] if it materializes (probability: [H/M/L])
- [Risk 2]: +[time] if it materializes (probability: [H/M/L])
Expected risk addition: [sum of (time × probability)]markdown## Effort Estimate: [Task Name] ### Summary | Metric | Value | |--------|-------| | Best case | [minimum time if everything goes right] | | Expected | [most likely total time] | | Worst case | [if major risks materialize] | | Confidence | [HIGH / MEDIUM / LOW] | ### Breakdown | # | Task | Complexity | Base | Calibrated | |---|------|-----------|------|------------| | 1 | [task] | [S/M/L/XL] | [time] | [adjusted time] | | 2 | [task] | [S/M/L/XL] | [time] | [adjusted time] | | ... | | | | | | | **Total** | | [sum] | [sum] | ### Hidden Work Included - [List of tasks not in the original request but required] ### Risks That Could Blow This Up - [Risk with highest impact] - [Other risks] ### Confidence Explanation [Why this confidence level — what data backs it, what's uncertain] ### Improving This Estimate [What information would increase confidence]
When no .velocity-profile.json exists and the user completes a task that was estimated:
json{ "version": 1, "created": "YYYY-MM-DD", "entries": [ { "date": "YYYY-MM-DD", "task": "description", "estimated_minutes": 120, "actual_minutes": 180, "complexity_score": 8, "notes": "underestimated integration with auth system" } ], "derived": { "accuracy_ratio": 0.67, "avg_complexity_multiplier": 1.0, "sample_size": 1, "confidence": "low" } }
After any estimated task is completed, ask: "How long did that actually take?"
Then update the profile:
accuracy_ratio = mean(estimated / actual) across all entriesconfidence based on sample size:The accuracy ratio is the key calibration number:
ratio = 0.5 → you estimate at half the real time → double your estimatesratio = 1.0 → perfectly calibratedratio = 1.5 → you overestimate → reduce by 33%Over time, as the profile grows, estimates converge toward reality.
Never do these:
| Anti-Pattern | Why It's Wrong | Do This Instead | |-------------|---------------|-----------------| | "It's simple, just a few hours" | Ignores hidden work | Decompose into atomic tasks first | | Estimating without reading the code | You don't know what you're changing | Read the affected files first | | Single-point estimates | Implies false precision | Always give best/expected/worst | | Anchoring to what the user wants to hear | Pleasing ≠ accurate | State the honest number, explain why | | Ignoring test/migration/config work | 30-50% of real effort is invisible | Always list hidden tasks | | Using other projects as reference | Every codebase has different friction | Use THIS project's velocity profile | | Rounding to neat numbers | 3 hours ≠ "half a day" | Keep the actual calculated number |
For small tasks where the full protocol is overkill:
QUICK ESTIMATE: [Task]
Complexity: [S/M/L] — [one line why]
Estimate: [time range]
Confidence: [H/M/L]
Hidden work: [any? or "none expected"]Use quick mode for tasks with complexity score ≤ 5.