Get Started Free →Review a bill of materials for cost, risk, and supply exposure — cost rollup, top-10 cost drivers, single-source and EOL risk, MOQ vs forecast mismatch, cost-down candidates, and tariff/logistics sensitivity. Use when asked to review a BOM, find cost-down opportunities, check component sourcing risk, or sanity-check BOM cost against target. Produces a structured BOM review with a cost driver Pareto, risk flags per line, and a prioritised cost-down list.
| Test case | Without → With | Effect | Δ tokens | Δ turns |
|---|---|---|---|---|
| case-18 | ✗→✓ | ▲ Improved | 71% | 0% |
| case-21 | ✗→✓ | ▲ Improved | 42% | 0% |
| case-04 | ✓→✓ | = Same ✓ | 35% | 0% |
| case-05 | ✓→✓ | = Same ✓ | 65% | 0% |
| case-06 | ✓→✓ | = Same ✓ | 49% | 0% |
A BOM is a list of promises: that each part will be buyable, at that price, at your volume, for the life of the product. This skill reviews a BOM the way a sourcing veteran does — Pareto the cost, flag the single-source and end-of-life traps before they become line-down events, and separate real cost-down candidates from wishful thinking.
Ask for these if not provided; work with a partial BOM if that's all there is, labelling gaps [missing — request from EE/sourcing]:
1. Rollup. Group into commodity classes (PCBA/semiconductors, passives, display, battery, mechanicals/enclosure, cables & connectors, packaging & accessories). Show cost and % per class, and total vs target with the gap.
2. Pareto. Rank the top-10 lines by extended cost (unit × qty). Everything after these is noise until the big ten are handled.
3. Risk flags — apply per line, worst flag wins:
| Flag | Trigger | Why it matters | |---|---|---| | 🔴 Single-source | One qualified vendor, no drop-in alternate | One factory fire from line-down | | 🔴 EOL / Obsolete | Lifecycle status EOL or last-time-buy announced | Forced redesign or LTB cash outlay | | 🟠 NRND | Not recommended for new design | Fine now, redesign within product life | | 🟠 MOQ mismatch | MOQ > ~13 weeks of forecast demand | Cash tied up, scrap risk on ECO | | 🟠 Long lead | Lead time > 16 weeks | Forecast error becomes shortage | | 🟡 Custom/tooled part | Custom silicon, tooled mechanical | Switching cost locks the vendor in |
4. Cost-down candidates. For each: the lever (negotiate at volume break / second-source and dual-run / value-engineer spec — e.g. tighter-than-needed tolerance, over-spec'd connector / design-out entirely), estimated saving per unit, effort, and earliest cut-in (which build or ECO).
5. Tariff & logistics sensitivity. Note country of origin concentration, HTS-code exposure for high-value lines, and what a duty change or freight spike does to landed cost.