Use when planning an AAMAS project timeline from venue fit through abstract, full-paper or extended-abstract upload, supplementary material, the double-blind rebuttal, decision, IFAAMAS camera-ready, registration, and presentation, with track-specific deadlines and backward-planning offsets for a game-theory-plus-experiments paper.
SkillScore92Maintained
Automatic
◆Project Management pack
Last verified 8/15/2026
What it changes
Passed 22 of 24 test cases with the skill, and 13 of 24 without it.
Without skill56%
With skill92%
Checks it passed that the model alone missed
States that rebuttals must not introduce new experimental results.
States that population training runs must be complete and seeds logged by week 4.
Structures the output into the five bracketed metadata lines required for status reporting.
and 9 more in the full report
11 fixed12 passed either way0 still failing2 broke
Pass-rate lift
+36 pp
Tokens
+12%
Agent turns
0%
Response time
-26%
Model gemini-3.6-flashMeasured 8/15/2026v123 of 25 cases passed with skill · 24 comparable
Tokens, turns and time describe resource use, not a dollar price.
See it in action
One of 10 test cases the skill fixed. Same model, same prompt, with and without the skill.
1 of 10
Prompt
We are planning our research roadmap for AAMAS and are currently 8 weeks out from the paper deadline. The primary author proposes spending weeks 8 to 5 on exploratory game definitions and testing different payoff matrices. What milestone must actually be completed at 8+ weeks out?
What was checked, without and with the skill
Checked
Without skill
With skill
Indicates that the game definition, solution concept, and proofs must be fixed at or before 8 weeks out.
Missed
Passed
case-14 · gemini-3.6-flash · 8/15/2026 · answers are capped and redacted
What's inside
The instructions your model reads when the skill loads.
SKILL.md68 linessingle file
AAMAS Workflow
Use this as the project-management skill for an AAMAS submission. Replace every date with the
current official timetable and work backward from the OpenReview cutoffs.
AAMAS is a conference owned by IFAAMAS, not a journal: it has no editor-in-chief and no
article-processing charge. Each edition is run by rotating General and Program Chairs, the cost
model is registration, and accepted papers are published open-access by IFAAMAS. Re-check the
current CFP and organization page rather than carrying names or dates forward - as of 2026-07-09
the live target is AAMAS 2027, whose full timetable was not yet confirmable.
Milestones
Venue fit: confirm the contribution is genuinely about interacting agents and choose the track
(main full paper, extended abstract, AAAI, JAAMAS, Blue Sky, Demo, Competitions).
Evidence lock: freeze the game, agent objectives, theorems, opponent sets, experiments, and
supplement contents.
Abstract deadline: submit the short plain-text abstract, authors, and keywords (main track's
abstract is due before the paper).
Paper deadline: upload the double-blind PDF and OpenReview fields.
Supplement deadline: upload the anonymized zip within the size cap.
Rebuttal window: respond to preliminary reviews with anonymous, evidence-anchored text; no new
results.
Decision: archive reviews, rebuttal, and the submitted version (all become public).
Acceptance: prepare the IFAAMAS camera-ready, register, plan the in-person presentation, and
release the public artifact.
Backward plan from the paper deadline
Weeks out (heuristic)
Game-theory-plus-experiments milestone
8+
Game defined, solution concept fixed, theorems proved
6
Self-play and opponent sets designed against each claim
4
Population runs complete, seeds logged
3
Full draft in AAMAS two-column format
2
Internal mock review by a game-theory-minded reader