Install any skill in seconds. Free to start, no credit card required.
Get Started Free →Use when planning an ASPLOS campaign across the two-deadline cycle — sequencing evidence building, the September 9, 2026 submission gate, author-response windows, the December 21 notification, Major Revision resubmission six weeks later, artifact evaluation, and the April 2027 conference in Crete, with owners per risk.
| Test case | Without → With | Effect | Δ tokens | Δ turns |
|---|---|---|---|---|
| case-01 | ✗→✓ | ▲ Improved | 84% | 0% |
| case-02 | ✗→✓ | ▲ Improved | 86% | 0% |
| case-03 | ✗→✓ | ▲ Improved | 71% | 0% |
| case-05 | ✗→✓ | ▲ Improved | 240% | 0% |
| case-07 | ✗→✓ | ▲ Improved | 48% | 0% |
An ASPLOS campaign is a pipeline with two entry gates per edition and a revision side-channel, not a single deadline sprint. All dates below are the verified 2027 cycle (CFP and conference site, checked 2026-07-08); reopen the official pages before committing a team to any of them.
| Gate | April cycle | September cycle | |---|---|---| | Full-paper deadline (11:59 PM AoE) | April 15, 2026 — passed | September 9, 2026 — the live gate | | Author response | July 6-9, 2026 — open this week (as of 2026-07-08) | December 1-4, 2026 | | Notification | July 27, 2026 | December 21, 2026 | | Major Revision due | camera-ready deadline, 6 weeks after notification | camera-ready deadline, 6 weeks after notification | | Conference | April 11-15, 2027, Heraklion, Crete, Greece | same |
There is no separate abstract deadline in 2027, and no mid-year third round — the edition moved from three deadlines to two. Missing September means waiting for the next edition's first gate.
A credible countdown for a systems paper with hardware-dependent evidence:
textT-10 weeks (by ~Jul 1) Freeze the claim list; run asplos-topic-selection; choose evidence instruments (silicon / FPGA / simulator). T-8 weeks Evaluation infrastructure done: baselines building, workloads chosen, simulator configs pinned. T-6 weeks First full results sweep; kill or descope claims the data will not carry. Start the two-page draft NOW — it is the part rapid review actually reads. T-4 weeks Full draft; internal red-team against the rapid-review question set; ablations running. T-2 weeks Freeze experiments. Citation-format pass (full names, no "et al.", DOIs). Anonymity sweep. T-1 week HotCRP entry created; PDF uploaded; co-author sign-off. T-0 Sep 9, 11:59 PM AoE HotCRP status shows *complete*, not draft.
rehearses them against asplos-writing-style; rapid review reads nothing else.
baselines) current so the rebuttal window never requires new runs under pressure.
disclosure, HotCRP fields; format violations risk rejection without review.
cycle) on every author's calendar at submission time, not after reviews arrive.
asplos-camera-ready immediately; camera-ready lands~6 weeks out, and artifact evaluation (asplos-artifact-evaluation) runs in parallel with its own appendix and deadlines (2027 AE calendar 待核实).
is due at the camera-ready deadline and counts as a submission; scope revision work to exactly what the decision letter requires, tracked in a change log that will become the resubmission note.
first two pages did not establish the intersection or the evidence. Fix framing before considering a new venue.
re-run asplos-topic-selection; some full-review rejects are strong ISCA, SOSP, or PLDI papers mis-aimed at the intersection.
ran jointly with EuroSys; 2026 (31st) was standalone in Pittsburgh; 2027 is in Crete. Travel, visa, and registration planning must restart per edition (fees and attendance rules for 2027: 待核实).
appeal to. A policy answer from a previous year's chairs is expired.
Systems evidence has procurement physics that a paper calendar must absorb:
ahead; reserve at claim-freeze time, not first-results time.
steps — one redesign late in the countdown costs a week, not an evening.
comes with NDA review of the paper text; start that review before T-4 or it becomes the critical path.
An accepted September-cycle paper has a compressed post-decision runway: camera-ready and any Major Revision work land ~6 weeks after December 21 — squarely across the holiday break, which the six-week plan must acknowledge — followed by artifact evaluation, then travel logistics for an April conference in Greece (visa timelines for some team members exceed the gap; start at notification). Presentation format, registration requirements, and speaker obligations for 2027 were 待核实 at pack-check time: read the acceptance email before assigning the talk.
Teams running multiple projects should treat the two gates as a pipeline: a paper that misses the September evidence bar can target the next edition's first gate with its evaluation matrix already built, while the response and revision windows of a September submission land in December-February — plan author bandwidth so a Major Revision does not collide with the next project's deadline sprint. One person cannot own the revision of paper A and pages 1-2 of paper B in the same six weeks.
text[Cycle chosen] September 2026 / next edition (reason) [Countdown health] on-track items · at-risk items with dates [Owners] two-page / evidence / compliance / response — names attached? [Branch plans] accept · major-revision · rapid-reject · full-reject, one line each [Calendar holds] Dec 1-4 response window + 6-week revision block reserved? Y/N [Facts to re-verify] <official pages to reopen before relying on this plan>
Other measured skills in the registry, with their headline benchmark lift.