Use when implementation and verification are complete and the user needs to finish a development branch by merging locally, creating a PR, keeping the branch, or discarding work. Applies after tests pass and code review is ready.
SkillScore64Maintained
Automatic
◆Coding pack
Last verified 8/15/2026
What it changes
Passed 10 of 15 test cases with the skill, and 6 of 15 without it.
Without skill41%
With skill64%
Checks it passed that the model alone missed
Asks the user how to handle uncommitted changes before continuing.
Refuses to delete worktrees owned by external harnesses or platforms.
Excludes the standard local branch merge option when operating on a detached HEAD.
and 4 more in the full report
6 fixed8 passed either way7 still failing1 broke
Pass-rate lift
+23 pp
Tokens
+27%
Agent turns
0%
Response time
-48%
Model gemini-3.6-flashMeasured 8/15/2026v114 of 22 cases passed with skill · 15 comparable
Tokens, turns and time describe resource use, not a dollar price.
See it in action
One of 6 test cases the skill fixed. Same model, same prompt, with and without the skill.
1 of 6
Prompt
Before checking git branches or presenting branch wrap-up options, what verification state must be confirmed first?
case-21 · gemini-3.6-flash · 8/15/2026 · answers are capped and redacted
What's inside
The instructions your model reads when the skill loads.
SKILL.md170 lines2 files
Dev Finish
Branch completion workflow. The goal is to make the last mile explicit: verify, inspect git state, present safe choices, then execute only what the user selects.
This skill does not implement code, write tests, or review code. Run dev-verify and dev-code-review first unless the user explicitly overrides.
Use only after a spec or clearly scoped requirement exists and the user wants a concrete implementation plan before coding. Trigger on explicit implementation-planning requests such as 基于这个 spec 出 plan, 需求已经清楚了给实施方案, 技术实施方案, 出个 plan, 做个实施方案, plan this, make a plan, consensus plan, ralplan. If the user says 写个方案, 给我个方案, 怎么做这件事, 帮我设计, or the requirement is still fuzzy, route to dev-grill-docs first. Produces a RALPLAN-DR plan with principles, decision drivers, viable options, ADR, and Planner-Arch