Toolkit for structuring hypotheses, variants, guardrails, and measurement plans.
SkillScore95Maintained
Automatic
◆Product Management pack
Last verified 8/23/2026
What it changes
Passed 21 of 22 test cases with the skill, and 11 of 22 without it.
Without skill50%
With skill95%
Checks it passed that the model alone missed
Schedules backlog grooming specifically for Monday
Schedules build reviews specifically for Wednesday
Schedules learnings retro syncs specifically for Friday
and 16 more in the full report
11 fixed10 passed either way0 still failing1 broke
Pass-rate lift
+45 pp
Tokens
+6%
Agent turns
0%
Response time
-26%
Model gemini-3.6-flashMeasured 8/23/2026v121 of 22 cases passed with skill
Tokens, turns and time describe resource use, not a dollar price.
See it in action
One of 11 test cases the skill fixed. Same model, same prompt, with and without the skill.
1 of 11
Prompt
During the design and instrumentation phase of a growth experiment, which systems or tools should developers reference to patch code and verify documentation?
What was checked, without and with the skill
Checked
Without skill
With skill
References Serena or Context7 to execute code patching and documentation confirmation
Missed
Passed
case-17 · gemini-3.6-flash · 8/23/2026 · answers are capped and redacted
What's inside
The instructions your model reads when the skill loads.
SKILL.md56 linessingle file
Experiment Design Kit Skill
When to Use
Translating raw ideas into testable hypotheses with clear success metrics.
Ensuring experiment briefs include guardrails, instrumentation, and rollout details.
Coaching pods on best practices for multi-variant or multi-surface tests.
Framework
Problem Framing – define user problem, business impact, and north-star metric.
Hypothesis Structure – "If we do X for Y persona, we expect Z change" with assumptions.
Measurement Plan – primary metric, guardrails, min detectable effect, power calc.
Variant Strategy – control definition, variant catalog, targeting, and exclusion rules.
Operational Plan – owners, timeline, dependencies, QA/rollback steps.